There is massive adoption in Bitcoin mining operations in Texas. Due to which electrical infrastructure needs to have the industry’s expected 5,000 megawatts (MW) of additional power demands by 2023. Currently, the Bitcoin mining industry in Texas consumes around 500 to 1,000 MW of power. The demand could increase as much as fivefold by 2023 and has planned an additional 3,000 to 5,000 MW.